Last edited by Netaur
Monday, April 20, 2020 | History

2 edition of Final environmental impact statement for hydropower license found in the catalog.

Final environmental impact statement for hydropower license

Final environmental impact statement for hydropower license

Catawba-Wateree hydroelectric project--FERC project no. 2232, North Carolina and South Carolina.

by

  • 376 Want to read
  • 8 Currently reading

Published by Federal Energy Regulatory Commission, Office of Energy Projects, Divison of Hydropower Licensing in Washington, DC .
Written in English

    Subjects:
  • Hydroelectric power plants -- Environmental aspects -- Catawba River Valley (N.C. and S.C.),
  • Environmental impact statements -- Catawba River Valley (N.C. and S.C.)

  • Edition Notes

    ContributionsUnited States. Division of Hydropower Licensing.
    Classifications
    LC ClassificationsTD195.E4 F5265 2009
    The Physical Object
    Pagination1 v. (various pagings) :
    ID Numbers
    Open LibraryOL24120878M
    LC Control Number2009438176

    Preview this book» What people are Environmental Impact Statement Full view - Snettisham Hydroelectric Power Project: Environmental Impact Statement Full view - Snettisham Hydroelectric Power Project: Environmental Impact Statement Full view - Common terms and phrases. The Sambor Dam is a proposed dam and hydroelectric power station on the Mekong River south of Sambor village in Prek Kampi District, Kratie Province, built, it would be the lowest dam of the Mekong's mainstream dams, and largest in Cambodia. The Cambodian Government sees the dam as an important potential source of income and if the dam is constructed, Coordinates: 12°47′N °57′E / .


Share this book
You might also like
Sure, you can learn another language

Sure, you can learn another language

If I were a major-league baseball player

If I were a major-league baseball player

Mix n match

Mix n match

Policy report

Policy report

Annual report.

Annual report.

Antonia.

Antonia.

Delivering rural youthwork.

Delivering rural youthwork.

Toxicological profile for endosulfan

Toxicological profile for endosulfan

Elements of symbolic logic

Elements of symbolic logic

Bibliography on homeworking.

Bibliography on homeworking.

Transactions =

Transactions =

Sleeping Beauty

Sleeping Beauty

Final environmental impact statement for hydropower license Download PDF EPUB FB2

FINAL ENVIRONMENTAL IMPACT STATEMENT FOR HYDROPOWER LICENSE Middle Fork American River Hydroelectric Project—FERC Project No. California Federal Energy Regulatory Commission Office of Energy Projects Division of Hydropower Licensing First Street, NE Washington, DC February FERC PDF (Unofficial).

Attached is the final environmental impact statement (EIS) for the proposed Sweetheart Lake Hydroelectric Project (No. ), which would be located in the City and Borough of Juneau, Alaska.

This final EIS documents the view of governmental agencies, non-governmental organizations, affected Indian tribes, the public, the license applicant. final environmental impact statement for hydropower license surrender office of energy projects f august e d e r a l t e n e r g y r g u l a o r y c o m m i s s i o n kilarc-cow creek hydroelectric project – ferc project no.

california federal energy regulatory commission office of energy projects first street, ne washington, dc. Get this from a library. Final environmental impact statement for hydropower license: El Dorado Project No. [United States.

Federal Energy Regulatory Commission. Division of Engineering and Environmental Review.]. Get this from a library. Final environmental impact statement for hydropower license: Catawba-Wateree hydroelectric project--FERC project no.North Carolina and South Carolina.

[United States. Division of Hydropower Licensing.;]. FINAL ENVIRONMENTAL ASSESSMENT. FOR HYDROPOWER LICENSE. Keowee-Toxaway Hydroelectric Project—FERC Project No. South Carolina and North Carolina. Federal Energy Regulatory Commission. Office of Energy Projects. Division of Hydropower Licensing.

First Street, NE. Washington, D.C. March FERC PDF File Size: 6MB. FINAL ENVIRONMENTAL IMPACT STATEMENT. FOR HYDROPOWER LICENSE. Martin Dam Hydroelectric Project—FERC Project No. Alabama. Federal Energy Regulatory Commission. Office of Energy Projects.

Division of Hydropower Licensing. First Street, NE. Washington, D.C. April EIS Final Environmental Impact Statement (File 4) EIS Final Environmental Impact Statement (File 5) OFFICE of NEPA POLICY and COMPLIANCE Independence Avenue, S.W.

Washington, DC Phone: Phone: Email: [email protected] An office of About nepa. Final environmental impact statement for hydropower license [electronic resource]: Catawba-Wateree Hydroelectric Project - FERC project no. North and South Carolina. Format Online Resource Book Published. FINAL ENVIRONMENTAL IMPACT STATEMENT FOR HYDROPOWER LICENSE Klamath Hydroelectric Project FERC Project No.

Oregon and California Federal Energy Regulatory Commission Office of Energy Projects Division of Hydropower Licensing First Street, N.E.

Washington, DC November App. Final environmental impact statement for hydropower license: Catawba-Wateree hydroelectric project--FERC project no. North Carolina and South Carolina E F «Previous.

Final environmental impact statement (FEIS) evaluates relicensing of the 1,megawatt Hells Canyon Hydroelectric Project (P) in Idaho and Oregon Published: () To extend the deadline for commencement of the construction of the Arrowrock Dam hydroelectric project in the state of Idaho report (to accompany S.

) (including cost. A notice of availability (NOA) of the Final Supplemental Environmental Impact Statement for a Single Nuclear Unit at the Bellefonte Plant Site (final SEIS) was published in the Federal Register on TVA prepared the final SEIS to update the extensive environmental information and analyses that exist respecting the Bellefonte site.

Final environmental impact statement for hydropower license McCloud-Pit Hydroelectric Project--FERC project no. California / Published: () Occurrence and transport of cadmium, lead, and zinc in the Spokane River basin, Idaho and Washington, water years by: Clark, G. Published: (). FINAL ENVIRONMENTAL IMPACT STATEMENT FOR HYDROPOWER LICENSES Yadkin Hydroelectric Project—FERC Project No.

Yadkin-Pee Dee River Hydroelectric Project—FERC Project No. North Carolina Federal Energy Regulatory Commission Office of Energy Projects Division of Hydropower Licensing First Street, NE Washington.

and amending the project license because the enlargement would be necessary in order to store the water in the enlarged system. On Apthe U.S.

Army Corps of Engineers (Corps) completed a final environmental impact statement (Final EIS) on all aspects of the proposed expansion of the Moffat Collection System. Start Preamble.

In accordance with the National Environmental Policy Act of and the Federal Energy Regulatory Commission's (Commission) regulations, 18 CFR partthe Office of Energy Projects has reviewed the application for license for the Bucks Creek Hydropower Project (FERC No. ) and has prepared a final environmental impact statement (EIS) for the project.

Book/Printed Material Draft environmental impact statement for hydropower license: Klamath hydroelectric project: FERC project no.Oregon and California / Klamath hydroelectric project, FERC project no. Oregon and California. DRAFT ENVIRONMENTAL IMPACT STATEMENT. FOR HYDROPOWER LICENSE. Middle Fork American River Hydroelectric Project—FERC Project No.

California. Federal Energy Regulatory Commission. Office of Energy Projects. Division of Hydropower Licensing.

First Street, NE. Washington, DC July FERC PDF. Hydropower - Environmental Impact Statements (EISs) Final Environmental Impact Statement for Relicensing of the Klamath Hydroelectric Project No. Issued: Novem Commission staff prepared a Final Environmental Impact Statement (FEIS) for relicensing of PacifiCorp’s megawatt Klamath Hydroelectric Project, located.

Hanford Tank Closure and Waste Management, Hanford Site, Richland, WA. This EIS evaluates the environmental impacts for the following three key areas: (1) retrieval, treatment, and disposal of waste from single-shell tanks (SSTs) and 28 double-shell tanks and closure of the SST system, (2) decommissioning of the Fast Flux Test Facility, a nuclear test reactor, and (3).

The Resource Final environmental impact statement: Blue Diamond South pumped storage hydroelectric project, Clark County, Nevada, FERC no. As evidenced by FERC’s release of the “Final Environmental Impact Statement for Hydropower License – Lake Elsinore Advanced Pumped Storage Project, FERC Project No.

FERC/EISF” (FEIS), dated JanuaryNEPA documentation for the two Project. Hydropower is a renewable energy source as they evaporate and condensate through the water cycle; hydropower can thus be used over and over again.

Because hydropower does not require complex processes to generate, it is a great source of backup power during power outages.

[4] II. Enduring Hydro. In accordance with the National Environmental Policy Act of and the Federal Energy Regulatory Commission’s (Commission) regulations, 18 CFR Partthe Office of Energy Projects has reviewed the application for license for the Bucks Creek Hydropower Project (FERC No.

) and has prepared a final environmental impact statement (EIS. The International Hydropower Association (IHA) is a non-profit organisation, working with a network of members and partners to advance sustainable hydropower.

IHA’s mission is to build and share knowledge on the role of hydropower in renewable energy systems, responsible freshwater management and climate change solutions.

IHA champions. Prior to the grant, the USFS had performed a final environmental impact statement (FEIS) and issued a Record of Decision (ROD) in for a MW hydropower project on Thayer Creek that would Angoon’s needs with substantial excess capacity for growth. Draft environmental impact statement [microform]: licensing 11 hydroelectric projects in the Kennebec River Basin: FERC project nos.

Moosehead Federal Energy Regulatory Commission, Office of Hydropower Licensing Washington, D.C. Draft Environmental Impact Statement for the Kilarc-Cow Creek Hydroelectric Project License Surrender and Proposed Decommissioning under P 8/25/10 - Shasta County submits request to reschedule the public meeting until mid-August re: the DEIS Kilarc -Cow Creek Project under P 7/6/10 - File Size: KB.

Under the National Environmental Policy Act (NEPA), FERC must publish an environmental document to analyze the environmental impacts of any licensing decision that may have a significant impact on environmental quality. As a practical matter, FERC publishes such a document in every proceeding for a new or amended license because there is always dispute.

The present investigations were carried out to develop a comprehensive and socially acceptable environment management plan so as to minimize the harmful impacts of. First of all, the choice of Small Hydropower, i.e. plants with a capacity of less than 10 MW: they are often run-of-river hydro plants and, thanks to the absence of a storage basin, have a minor impact on the hydrological regime of the river, one of the most important sources of environmental impact.

Secondly, the application of a careful and mo. Final environmental impact statement}, author = {}, abstractNote = {This final environmental impact statement (FEIS) has been prepared for the Federal Energy Regulatory Commission (Commission) to consider modifications to the existing Lower Mokelumne River Project (LMRP) (FERC Project No.

) in California. Chinook salmon and steelhead. Traditional hydropower creates a number of adverse environmental effects, nowadays largely recognized but still in conflict with rights granted in previous era of development.

The Upper Rhone River basin is heavily developed for hydropower by: 3. Environmental Impact Assessment of Kol-Dam Hydropower Project – A Case Study from Himachal Pradesh, India Hukam Chand 1 *, K. Verma 2 and Tanvi Kapoor 1 1 Department of Environmental Science, College of Forestry, nt Singh Parmar University of Horticulture and Forestry, Solan, H.P India.

- Explore julietnkwegu's board "Environmental impact assessment" on Pinterest. See more ideas about Environmental impact assessment, Environment and Carbon footprint pins. discussed in the Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Main Report, Final Report and the supplemental EIS’ specific to individual nuclear facilities that 78 Office of Nuclear Reactor Regulation.

Generic Environmental Impact Statement for License Renewal of Nuclear. Hydropower Resource Assessment Final Report Alison M. Conner James E. Francfort Ben N. Rinehart. Published December Idaho National Engineering and Environmental Laboratory Renewable Energy Products Department Lockheed Martin Idaho Technologies Company Idaho Falls, Idaho Prepared for the U.S.

Department of Energy. Landscape impact of Small Hydropower Projects. Each of the components that comprise a hydro scheme has potential to create a change in the visual impact of the site by introducing contrasting forms, lines, color or textures.

The design, location, and appearance of any one feature may well determine the level of public acceptance for the entire. The Low Impact Hydropower Institute (LIHI) is a non-profit (c)(3) organization dedicated to reducing the impacts of hydropower generation through the certification of hydropower projects that have committed to environmental, cultural and recreational stewardship pursuant to the Low Impact Hydropower Institute’s criteria.

FINAL ENVIRONMENTAL IMPACT STATEMENT MIDDLE EAST FORK PLANNING AREA WASTEWATER TREAT ME NT SYSTEMS CLERMONT COUNTY, OHIO Prepared by UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGION 5 CHICAGO, ILLINOIS with assistance from ESEI, Inc. South Bend, Indiana August Appr Valdas V.

Adaiscui .Building for Environmental Impact Assessment (EIA) of Hydropower Project in Nepal jointly managed by the then Ministry of Population and Environment and the Norwegian Directorate for Nature Management.

Citation: MoEST, AGuide to Environmental Management Plan of Hydropower Projects. Ministry of Environment, Science and Technology, Kathmandu.STUDY Climate Change Assessment for Hydropower Project Licensing 41 were added to the observed long-term stream-flow database record (see Figure CS).

The resulting five future stream flow scenarios were then fed into the Simulation Program for Long-term Analysis of System Hydraulics (SPLASH) to estimate average annual reve-nues.